Copper Single-Hole Terminal Lug SC35-12.5 LNG/CHS

0,66 
Without VAT: 0,53 
01.036.0252
1 to 3 days
+

Minimum quantity for "Copper Single-Hole Terminal Lug SC35-12.5 LNG/CHS" is 100.

Copper Single-Hole Terminal Lug SC35-12.5 LNG/CHS

Copper hole terminal (Lug)

UL: E357535


• Body: Copper (99.9%)
• Coating: Tin

Conductor (mm²) Φ (mm) D-d
(mm)
(mm) (mm) (mm)
35.00 13.00 10.20-8.20 19.00 14.00 39.00

 

No posts found

Write a review

Shipping

We ship Worldwide by Hellenic Post

Delivery time is 5-10 days, for Europe, 10-25 days, Worldwide.

The delivery cost is 25,00 EUR up to 2kg by post.

130,00 EUR up to 200kg by Truck. (only for Europe)

Similar products

We also recommend